Data Centre at Sunview Way (SGA 1) for META (Phase 1&2)

Client: Schnieder Electric / Wah Loon Plants and Instrumentation
Project Scope: BMS Installation, Including BIM design and Project Coordination.
Location: Sunview Way, Singapore
Duration: Phase 1 - 36 Months Phase 2 - Ongoing 12 Months
Tapro Engineering was the trusted partner to Schneider Electric and Wah Loon for Phases 1 and 2 of Meta’s largest data center project. Our team managed on-site execution, testing and integration to keep critical systems on schedule and within spec. The work passed Meta’s independent audit with a Gold Standard rating by Standard Calibrations Inc. This reflects our approach to clear documentation, tight QA, and fast close-outs. The result is a stable, scalable platform ready for future expansions.